Know my build

Quantity Take-off from Your Drawings

Quantity Take-off Services for UK Building Projects

Know exactly how much of everything your project needs. We measure your drawings trade by trade and send back a clear schedule of quantities, ready to price a job, order materials or check a subcontractor's figures. For builders, contractors, architects, developers and homeowners across the UK.

Quantity Take-off Services for UK Building Projects
  • 200+

    Projects Estimated

  • 10+

    Years Of Experience

  • NMR2

    Measured

  • 1

    Fixed Quote in one working day

About the service

What Is a Quantity Take-off?

A quantity take-off measures your building from the drawings and lists how much of each item the job needs: wall and floor areas, lengths of beams and pipework, volumes of concrete, and counts of doors and windows. It gives you the quantities before anyone puts a price on them.

We measure your drawings and specification in line with NRM2 and group the quantities by trade or element. Unlike a bill of quantities, a take-off is a working schedule for your own pricing or ordering, not a formal tender document.

When to get one

When you need to price a job or order materials and don't have time to measure it yourself. Only have planning drawings? Send them over and we'll confirm what can be measured.

What we need

Drawings, specification and any existing schedules, as PDF, DWG or DXF.

What's Involved

  • Review of your drawings, scales and specification
  • Measurement of areas, lengths, volumes and counts, trade by trade
  • Quantities grouped by trade or element
  • A cross-check between plans, sections and elevations
  • A query list for anything the drawings do not show
  • A final check before issue

What You Receive

  • Quantity schedule: every item with a description, quantity and unit, grouped by trade or element, ready to price or send to subcontractors
  • Marked-up drawings: showing where each quantity was measured, so any figure can be checked
  • Material totals: quantities summarised by material, so you can order without over- or under-buying
  • Assumptions and exclusions: what was measured and what was left out, so nothing is missed at pricing
  • Format: Excel and PDF

Who It's For

  • Builders and contractors: price more jobs without spending evenings measuring drawings
  • Architects and designers: check the quantities as the design develops
  • Property developers: get reliable quantities to test build costs and plan purchasingors looking for trade package take-offs
  • Construction companies: give each trade an accurate quantity to price against
  • Homeowners and self-builders: know what materials the build needs and check builders' quotes
What we offer

Our Quantity Take-off Services for UK Building Projects Services

  • Material Take-off

    Quantities of every material the build needs, set out for ordering and pricing supplies.

    Best for

    Builders, self-builders, contractors

    Included

    • Totals by material
    • Quantities in ordering units (m², m³, nr)
    • Notes on what is included
  • Trade Take-off

    Quantities split by trade, ready to send to subcontractors or to check their prices.

    Best for

    Main contractors, construction companies

    Included

    • One schedule per trade
    • Totals that reconcile to the full take-off
    • Scope notes for each trade
  • New-Build House Take-off

    A full residential take-off for new homes, from a single self-build to a small housing scheme.

    Best for

    Developers, self-builders, builders

    Included

    • Substructure, superstructure and roof
    • Internal finishes and fittings
    • External works and drainage
  • Extension and Refurbishment Take-off

    Quantities for work to an existing home, including strip-out and alterations that are easy to overlook.

    Best for

    Homeowners, builders

    Included

    • Strip-out and alterations
    • New structure and openings
    • Making good and finishes room by room
  • Groundworks and External Works Take-off

    Quantities for everything below ground and around the building.

    Best for

    Contractors, developers

    Included

    • Excavation and disposal volumes
    • Foundations, slabs and drainage runs
    • Paving, kerbs and landscaping areas
  • Take-off with Pricing

    Your quantities priced for labour, materials and plant, so you get a cost estimate as well as the measurements.

    Best for

    Contractors, developers, homeowners

    Included

    • Measured quantities
    • Rates and line totals
    • Cost summary by trade
How it works

How Our Quantity Take-off Services for UK Building Projects Process Works

  1. Share Your Project

    Upload your drawings and specification, and tell us which trades or elements you need measured.

  2. Review Your Quote

    We reply within one working day with a fixed price and a delivery date. No obligation. `

  3. Receive Your Take-off

    Your quantity schedule arrives in Excel and PDF, with any drawing queries listed. Ready to price or order from.

Turnaround line

Larger and commercial projects are confirmed in your quote.

Revisions line

Drawings changed? Small revisions within 14 days of delivery are free. Larger design changes are quoted before we start.

Why choose us

Why Choose Know My Build for Your Quantity Take-off

Your take-off is measured by a London-based estimating team with 10+ years in UK construction, and covered by professional indemnity insurance.

Quantity Take-off Services for UK Building Projects — a recent project
  • Cost Intelligence

    Every quantity traces back to your drawings, so you can check any figure before you price.

  • Bespoke Estimating

    Quantities set out by trade or by element, to match the way you price.

  • Commercial Clarity

    What was measured and what was not is stated up front, so nothing slips through at pricing.

  • Expert Project Support

    A named estimator answers your questions on the quantities.

  • Professional indemnity insured
  • Measured to NRM2
  • London-based team
Client feedback

What Our Clients Say

Dear Team,

“Know my build supported us through a challenging claim and final account. They explained everything clearly and helped us engage confidently with both the architect and the contractor.”
Daniel Laval & BrigettePrivate ClientsClient
Common questions

Frequently Asked Questions

  • A quantity take-off is a list of the measured quantities in a building project, taken from the drawings: areas, lengths, volumes and counts, each with its unit. Builders use it to price work and order materials.

Ready to Price Your Project?

Free fixed quote within one working day.

Get in touch

Request Your Quantity Take-off Services for UK Building Projects Quote

Send your drawings and tell us about your project. We'll reply with a fixed quote within one working day.

Open Monday to Friday, 9am to 5:30pm

What happens next

  1. 01We review your drawings
  2. 02We send a fixed quote
  3. 03You decide
Project type
Upload drawings

We reply within one working day. Your drawings are confidential and never shared.